Print Page | Close Window

China education network resources construction con

Printed From: PHAworkers Online
Category: General
Forum Name: Rumor Mill
Forum Discription: Discuss/Debunk what you've heard somewhere.
URL: http://www.phaworkers.org/forum//forum_posts.asp?TID=73373
Printed Date: Feb 11 2026 at 11:51pm
Software Version: Web Wiz Forums 8.03 - http://www.webwizforums.com


Topic: China education network resources construction con
Posted By: Fordtvoh
Subject: China education network resources construction con
Date Posted: May 01 2013 at 2:09pm
consultation by both parties, XX electrical engineering contract for xx electric operation team, package price is XX Yuan /M2, entered into the following protocols:
, the two parties of the contract: Party A: Party B:


two, the contract:
electrical engineering, http://stylomontblancpascher0.webnode.fr - mont blanc pas cher , including lighting, television, telephone, piping, wear wire, lighting installation, installing distribution box, lightning protection grounding construction drawings. Contains. Maintenance and temporary line of electric equipment to the construction site erection and maintenance of unit project, http://www.hollisterco-franceall.com - hollister . Rights and obligations of both parties of the contract:
three,
1, Party A is responsible for material supply, the coordination of various processes in the construction.
2, Party B must file according to the design, the construction and acceptance specification, construction organization design, construction details, safety disclosure requirements of construction, material quality problem report in construction. Party B shall be a week ahead of the material plan, the completion of the construction schedule arrangement of Party A on time, and with the other professional construction.
3, Party B must ensure the safety of construction, to prevent major accidents, avoid injury accident. If Party B does not follow the rules and safety tests, http://conversepaschersoldes.webnode.fr - converse pas cher , the construction, the incorrect use of labor protection supplies, http://www.hollisterukoutletsaleu.co.uk - hollister uk , accident liability according to the safety production contract responsibility.
4, B in the construction for the materials must be keeper allowed, no occurrence of waste and Jerry phenomenon occurred, such as waste and not according to the design and construction quality problems, Party A shall have the right to give economic punishment depending on the circumstances.
5, Party B shall use power tools, small tools to take good care of, for the normal damage (such as carbon brush out, bearing damaged, http://skinnytree.berkeleyblogs.com/archives/2009/09/visitation.html#comments - 2009-2010 school next semester school Summary - Su , Party A shall be responsible for repair), http://www.abercrombiefrance-soldesfr.com - abercrombie france , artificial damage (such as broken shell, and bending bearing, http://stylomontblancpascher0.webnode.fr - stylo mont blanc , bearing damage and burn for rotor, stator and so on), Party B shall be responsible for all repair expenses.
6, if Party B in the construction of exceeding the quality check standard are not to calculate salary, rework unqualified rework, rework and punish the material fee.
7, each procedure B construction end must perform his signature formalities, http://www.abercrombiefrance-soldesfr.com - abercrombie , can carry out the procedure construction. Monthly report work shall be put into effect by the project manager, construction workers, http://conversepascheres.webnode.fr - converse pas cher , technicians and quality inspector signature.
8 Party B, http://i6i6.jp/blog/2012/07/iphoneipod.html#comments - Investigation is th , Party A has the right to refuse illegal command, have the right to not reasonable schedule objection, but both parties confirmed, must be completed on time. Party A has the obligation to provide labor protection products to Party B.
9, the signing of the agreement to Party A Party B delivery of construction safety deposit 500 yuan, require Party B to comply with safety regulations and safety regulations in the construction, project contracting content after completion, without the occurrence of safety accidents and not in violation of the safety regulations, the deposit refunded.
10, in order to ensure the construction of civilization, civilized construction require Party B to comply with the regulations on the scene, Party B shall deliver the civilized construction of mortgage payment of 500 yuan, http://www.hollisterco-franceall.com - hollister france , after the completion of Party B does not violate the operation of civilized construction regulations, Party A will refund the deposit.
10, if Party B the construction of good quality, http://www.hollisterukoutletsaleu.co.uk - hollister , material saving, civilized construction, actively participate in the formulation of the material planning and put forward reasonable suggestions, give 0.1-0.>, http://hawaiiplantdisease.net/b2e/blog2.php/plant-disease-diagnosis-a-stepwise/ - 95% of the students ; after the completion of Party A Party B performance



Print Page | Close Window

Bulletin Board Software by Web Wiz Forums version 8.03 - http://www.webwizforums.com
Copyright ©2001-2006 Web Wiz Guide - http://www.webwizguide.info